BIOMAX Instructions

1. Connect diversion pipe to cold water line
2. Connect ball valve (Shut off switch)
3. Connect pressure regulating valve
4. Connect feed into intake of stage 1. Bleed off Stage 1 through tap outlet for 5 minutes
5. Connect stage 2 and repeat bleed 5 minutes-
6. Repeat same again on stages 3 & 4. Done. Each stage has an inflow and out flow