BIOMAX Instructions
1. Connect diversion pipe to cold water line2. Connect ball valve (Shut off switch)3. Connect pressure regulating valve4. Connect feed into intake of stage 1. Bleed off Stage 1 through tap outlet for 5 minutes5. Connect stage 2 and repeat bleed 5 minutes-6. Repeat same again on stages 3 & 4. Done. Each stage has an inflow and out flowConnecting and changing filters with John Guest fittings: